400 kV cable Laying Project at Tata Steel Kalinganagar

 Tata Steel Kalinganagar has to Shift its the Existing Tower to give clearance for its Pellet plant. Thus 400 kV existing Gantry has to be shifted to a New Location which requires laying of 6 nos. of Cable between existing Gantry to New Gantry through tunnel and cable gallery.

  1. Supply of Jointing and Termination Structures
  2. Laying of 7.2 Km of 1C X 630 Sqmm 400 kV Cable on tray  in tunnel and cable gallery
  3. Jointing & Terminations  for 6 nos. cable

 

Cable Laying Package

Cable Laying Package is a dedicated Package for Laying, Jointing and Termination of 33 kV 132 kV, 220kV at Tata Steel Kalinganagar

 

GIS Package

GIS Package is a dedicated Package for Erection Testing & Commissioning of GIS & CRP of  33 kV and 132 kV, Switchgears Panel of 6.6 kV at Tata Steel Kalinganagar

 

Transformer  Package

Transformer Package is a dedicated Package for Erection Testing and Commissioning of Transformer of different grade as 315 MVA 400kV/220 kV, 200 MVA 220kV/132kV ,  100MVA 132kV/33kV, 55 MVA 33kV/11kV, 25/31.5 MVA 33kV/6.6kV , 20/25 MVA 33kV/6.6kV  including Oil Filtration at Tata Steel Kalinganagar